REQUEST FOR ENGINEERING
SERVICE PROPOSALS
Abbeville County
School District is seeking the services of an engineering firm for the
following project: Bus Parking Lot Expansion at Dixie and Calhoun Falls
High SCHOOLS. Firms interested in performing these services
shall submit a letter of interest and 2 copies of resume listing qualifications
and performance data in similar projects to: G. Samuel Jones, Facilities and
Operations Director at Abbeville County School District, 400 Greenville Street,
Abbeville, SC 29620, telephone (864) 366-5427, fax (864) 366-8531. All inquires shall be received on or before
3:00 PM Friday, May 4, 2007.
QUALIFICATIONS: Proposals will be accepted from engineering
firms that are licensed by the State of South Carolina and that can demonstrate
experience in the design and fast tract completion of similar asphalt parking
lots.
Scope Of Work shall
include but not be limited to the following specific task:
1. Perform
investigative survey of the site and adjacent properties as required to
establish design criteria and establish project budget.
2. Prepare
specifications, drawings and bid documents for asphalt parking lots and fencing
at Dixie High School and Calhoun Falls High School, include sufficient detail
to ensure that the completed projects meets the expectations of the owner.
3. Submit
specifications and drawings to the Office of School Facilities (State
Department of Education) for approval, if required.
4. Coordinate
relocation of existing public utilities that may be required with the
appropriate utility companies.
5. Assist
the school district in receiving bids for the expansion of the existing bus
parking lot at Dixie High School now and for a new parking lot at Calhoun Falls
High School in the summer of 2008.
6. Conduct
periodic inspections during construction and final inspection for approval.
Based on responses received, the following factors will be
used to evaluate and select an A/E firm to complete the project:
1.
Past
experience of the firm in successfully completion of similar design work.
2.
The
ability of the firm to “Fast Track” the project and complete the design work
including all drawings and bid specifications to complete and close out the
first phase of the project by August 1, 2007.
3. Reasonableness of price for services. Fee negotiations shall be for a fixed fee per project site.
4. Assurance that the design firm is qualified to provide requested services in accordance with the Owners plan and schedule.